Commit Graph

5 Commits

Author SHA1 Message Date
eugeneswalker
9eb87d1026
OLCF Ascent gitlab ci trigger: pass SPACK_REF (#18875) 2020-09-23 09:35:29 -07:00
Shahzeb Siddiqui
58fb6cdaad
trigger ascent e4s pipeline on merge to spack develop (#18655)
* trigger ascent e4s pipeline on merge to spack develop

* change pipeline name ecpcitest/e4s is the pipeline that will be triggered for merge on develop its the E4S use-case.
2020-09-18 10:38:29 -07:00
Scott Wittenburg
f537d5bb58 Make sure each develop pipeline tests associated commit 2020-09-14 10:37:42 -06:00
Scott Wittenburg
597b43e30a Rely on E4S project variable for SPACK_REPO 2020-09-04 11:18:56 -06:00
Scott Wittenburg
e0572a7d96 Pipelines: Support DAG scheduling and dynamic child pipelines
This change also adds a code path through the spack ci pipelines
infrastructure which supports PR testing on the Spack repository.
Gitlab pipelines run as a result of a PR (either creation or pushing
to a PR branch) will only verify that the packages in the environment
build without error.  When the PR branch is merged to develop,
another pipeline will run which results in the generated binaries
getting pushed to the binary mirror.
2020-05-14 21:11:07 -07:00